Performance Measure

Total number of ramp meters (by year of installation).

Associated Objectives

Increase the number freeway ramps currently metered by X percent by year Y.

Service Packages that Support the Performance Measure

ST03-Eco-Traffic Metering
TM05-Traffic Metering

Associated Goals

Achieve a significant reduction in traffic fatalities and serious injuries on all public roads
Improve the efficiency of the surface transportation system

Planning Factors

B. Increase the safety of the transportation system for motorized and nonmotorized users;
G. Promote efficient system management and operation;

Source

Planning for Operations Desk Reference