m_and_c_resource_status_for_needs
This data flow is used within the Manage Maintenance and Construction function and contains a list of the resources available, including equipment, maintenance and construction vehicles, and materials based on the most recent status collected. The data flow consists of the following data items each of which is defined in its own DDE:
m_and_c_resources
+ time
+ date
Sub Data Flows
Parent Data Flows
- None
Associated PSpecs/Terminators