ftop-lighting_system_control_parameters
This data flow is received from the traffic operations personnel and is used to request activation of an electrical lighting system along the roadside.
Sub Data Flows
- Primitive Element
Parent Data Flows
Associated PSpecs/Terminators
Parent Information Flows