Transit Management Center --> Maint and Constr Management Center:
work plan feedback
Definitions
work plan feedback (Information Flow): Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.
Transit Management Center (Source Physical Object): The 'Transit Management Center' manages transit vehicle fleets and coordinates with other modes and transportation services. It provides operations, maintenance, customer information, planning and management functions for the transit property. It spans distinct central dispatch and garage management systems and supports the spectrum of fixed route, flexible route, paratransit services, transit rail, and bus rapid transit (BRT) service. The physical object's interfaces support communication between transit departments and with other operating entities such as emergency response services and traffic management systems.
Maint and Constr Management Center (Destination Physical Object): The 'Maint and Constr Management Center' monitors and manages roadway infrastructure construction and maintenance activities. Representing both public agencies and private contractors that provide these functions, this physical object manages fleets of maintenance, construction, or special service vehicles (e.g., snow and ice control equipment). The physical object receives a wide range of status information from these vehicles and performs vehicle dispatch, routing, and resource management for the vehicle fleets and associated equipment. The physical object participates in incident response by deploying maintenance and construction resources to an incident scene, in coordination with other center physical objects. The physical object manages equipment at the roadside, including environmental sensors and automated systems that monitor and mitigate adverse road and surface weather conditions. It manages the repair and maintenance of both non-ITS and ITS equipment including the traffic controllers, detectors, dynamic message signs, signals, and other equipment associated with the roadway infrastructure. Weather information is collected and fused with other data sources and used to support advanced decision support systems.
The physical object remotely monitors and manages ITS capabilities in work zones, gathering, storing, and disseminating work zone information to other systems. It manages traffic in the vicinity of the work zone and advises drivers of work zone status (either directly at the roadside or through an interface with the Transportation Information Center or Traffic Management Center physical objects.)
Construction and maintenance activities are tracked and coordinated with other systems, improving the quality and accuracy of information available regarding closures and other roadway construction and maintenance activities.
Included In
This Triple is in the following Service Packages:
This triple is associated with the following Functional Objects:
This Triple is described by the following Functional View Data Flows:
This Triple has the following triple relationships:
Relationship | Source | Destination | Flow |
---|---|---|---|
Interactive | Maint and Constr Management Center | Transit Management Center | maint and constr work plans |
Communication Solutions
- (None-Data) - Secure Internet (ITS) (43)
- (None-Data) - Apache Kafka (44)
- (None-Data) - OMG DDS (44)
- (None-Data) - OASIS MQTT (50)
- (None-Data) - OASIS AMQP (61)
Selected Solution
Solution Description
ITS Application Entity
Development needed |
Click gap icons for more info.
|
||
Mgmt
OASIS MQTT DMP |
Facilities
Development needed OASIS MQTT |
Security
|
|
TransNet
|
|||
Access
Internet Subnet Alternatives |
Note that some layers might have alternatives, in which case all of the gap icons associated with every alternative may be shown on the diagram, but the solution severity calculations (and resulting ordering of solutions) includes only the issues associated with the default (i.e., best, least severe) alternative.
Characteristics
Characteristic | Value |
---|---|
Time Context | Recent |
Spatial Context | Regional |
Acknowledgement | True |
Cardinality | Unicast |
Initiator | Source |
Authenticable | True |
Encrypt | False |
Interoperability | Description |
---|---|
Regional | Interoperability throughout the geopolitical region is highly desirable, but if implemented differently in different transportation management jurisdictions, significant benefits will still accrue in each jurisdiction. Regardless, this Information Flow Triple should be implemented consistently within a transportation jurisdiction (i.e., the scope of a regional architecture). |
Security
Information Flow Security | ||||
---|---|---|---|---|
Confidentiality | Integrity | Availability | ||
Rating | Low | Moderate | Low | |
Basis | Probably not a significant issue if this data is observed. If the area under construction is sensitive in nature, may be MODERATE. Triples originating with the EMC imply a potential incident, so are rated MODERATE. | Modifications to the work plan should be correct so that they can be properly accomodated. Errors or manipulation of this data may undermine the intent of the flow and application. | This probably doesn't need to be updated often. |
Security Characteristics | Value |
---|---|
Authenticable | True |
Encrypt | False |