Traffic Management Center --> Intermodal Terminal:
intermodal freight traffic information
Definitions
intermodal freight traffic information (Information Flow): Information on traffic conditions affecting the depot including information concerning any special traffic control accommodations or restrictions for commercial vehicles.
Traffic Management Center (Source Physical Object): The 'Traffic Management Center' monitors and controls traffic and the road network. It represents centers that manage a broad range of transportation facilities including freeway systems, rural and suburban highway systems, and urban and suburban traffic control systems. It communicates with ITS Roadway Equipment and Connected Vehicle Roadside Equipment (RSE) to monitor and manage traffic flow and monitor the condition of the roadway, surrounding environmental conditions, and field equipment status. It manages traffic and transportation resources to support allied agencies in responding to, and recovering from, incidents ranging from minor traffic incidents through major disasters.
Intermodal Terminal (Destination Physical Object): The 'Intermodal Terminal' represents the terminal areas corresponding to modal change points. This includes interfaces between roadway freight transportation and air, rail, and/or water shipping modes. The basic unit of cargo handled by the Intermodal Terminal physical object is the container; less-than-container load handling is typically handled at a different facility (i.e., Freight Consolidation Station). The Intermodal Terminal can include electronic gate control for entrance and exit from the facility, automated guidance of vehicles within the facility, alerting appropriate parties of container arrivals and departures, and inventory and location of temporarily stored containers.
Included In
This Triple is in the following Service Packages:
This triple is associated with the following Functional Objects:
This Triple is described by the following Functional View Data Flows:
This Triple has the following triple relationships:
None |
Communication Solutions
- (None-Data) - Secure Internet (ITS) (43)
- (None-Data) - Apache Kafka (44)
- (None-Data) - OMG DDS (44)
- (None-Data) - OASIS MQTT (50)
- (None-Data) - OASIS AMQP (61)
Selected Solution
Solution Description
ITS Application Entity
Development needed |
Click gap icons for more info.
|
||
Mgmt
Apache Zookeeper |
Facilities
Development needed Apache Kafka Apache Zookeeper |
Security
IETF RFC 8446 |
|
TransNet
|
|||
Access
Internet Subnet Alternatives |
Note that some layers might have alternatives, in which case all of the gap icons associated with every alternative may be shown on the diagram, but the solution severity calculations (and resulting ordering of solutions) includes only the issues associated with the default (i.e., best, least severe) alternative.
Characteristics
Characteristic | Value |
---|---|
Time Context | Recent |
Spatial Context | Regional |
Acknowledgement | True |
Cardinality | Unicast |
Initiator | Destination |
Authenticable | True |
Encrypt | True |
Interoperability | Description |
---|---|
Regional | Interoperability throughout the geopolitical region is highly desirable, but if implemented differently in different transportation management jurisdictions, significant benefits will still accrue in each jurisdiction. Regardless, this Information Flow Triple should be implemented consistently within a transportation jurisdiction (i.e., the scope of a regional architecture). |
Security
Information Flow Security | ||||
---|---|---|---|---|
Confidentiality | Integrity | Availability | ||
Rating | Moderate | Moderate | Moderate | |
Basis | While this likely does not contain any private or competitive data, it may contain a large bundle of freight movement information, that if observed by a hostile third party, would provide a snapshot that enabled that attacker to identify targets without needing to be physically present. | CVO decisions including job acceptance, routing and work planning are impacted by the quality of this data, so incorrect, unavailable or fraudulent data could have a significant financial impact. | CVO decisions including job acceptance, routing and work planning are impacted by the quality of this data, so incorrect, unavailable or fraudulent data could have a significant financial impact. |
Security Characteristics | Value |
---|---|
Authenticable | True |
Encrypt | True |