Objective

Decrease system-wide signal delay on transit routes by X percent per year.

Associated Performance Measures

System-wide signalized stop delay on transit routes.

Service Packages that Support the Objective

PT09-Transit Signal Priority
SU05-Location and Time
TM03-Traffic Signal Control
TM04-Connected Vehicle Traffic Signal System

Associated Goals

Achieve a significant reduction in congestion
Improve the efficiency of the surface transportation system

Planning Factors

D. Increase the accessibility and mobility of people and for freight;
G. Promote efficient system management and operation;

Source

Planning for Operations Desk Reference



 
Since the mapping between objectives and service packages is not always straight-forward and often situation-dependent, these mappings should only be used as a starting point. Users should do their own analysis to identify the best service packages for their region.