9.3.2.4: Provide M&C Field Personnel Interface for Work Zones

This process shall provide an interface for M&C Field Personnel to input status of their work zone activities. This work zone status input shall include the status of maintenance or construction work, field personnel, equipment, or materials. The process shall also be responsible for providing status information to the M&C Field Personnel on devices operated or monitored from on-board the maintenance and construction vehicle. The process shall accept control inputs for those devices operated from on-board the maintenance and construction vehicle. The process shall receive status of other work zone activity for presentation to the M&C Field Personnel.

This process is associated with the Maint and Constr Vehicle OBE physical object.

This process is associated with the following functional objects:

This process is associated with the following data flows: