Kind: Terminator
Class: Center
Type: Human
Maint and Constr Center Personnel
Overview
The people that directly interface with a Maintenance and Construction Management Center. These personnel interact with fleet dispatch and management systems, road maintenance systems, incident management systems, work plan scheduling systems, and work zone management systems. They provide operator data and command inputs to direct system operations to varying degrees depending on the type of system and the deployment scenario.
This physical object does not have any functionality defined in ARC-IT, as it exists outside the system functional boundary.
This physical object is included in the following Service Packages:
- MC01: Maintenance and Construction Vehicle and Equipment Tracking
- MC02: Maintenance and Construction Vehicle Maintenance
- MC03: Roadway Automated Treatment
- MC04: Winter Maintenance
- MC05: Roadway Maintenance and Construction
- MC06: Work Zone Management
- MC08: Maintenance and Construction Activity Coordination
- MC09: Infrastructure Monitoring
- MC10: Asset Tracking
- MC11: Maintenance and Construction Signal Priority
- PS11: Early Warning System
- PS12: Disaster Response and Recovery
- PS13: Evacuation and Reentry Management
- SU11: Field Equipment Maintenance
- TM08: Traffic Incident Management System
- TM19: Roadway Closure Management
- WX01: Weather Data Collection
- WX02: Weather Information Processing and Distribution
- WX04: Roadway Micro-Prediction
Triples
Security
This physical object has the following security levels for the associated service packages.
Physical Object Security | ||||
---|---|---|---|---|
Security Class | Confidentiality | Integrity | Availability | Service Package |
Security levels have not been defined yet. |
Interfaces Diagram
Standards
Currently, there are no standards associated with the physical object itself though the interfaces may have standards associated with them. For standards related to interfaces, see the specific information flow triple pages.