Objective

Reduce delay associated with incidents on arterials by X percent by year Y.

Associated Performance Measures

Hours of delay associated with incidents.

Service Packages that Support the Objective

CVO06-Freight Signal Priority
MC06-Work Zone Management
PS08-Roadway Service Patrols
ST02-Eco-Traffic Signal Timing
TI01-Broadcast Traveler Information
TI07-In-Vehicle Signage
TM03-Traffic Signal Control
TM04-Connected Vehicle Traffic Signal System
TM06-Traffic Information Dissemination
TM08-Traffic Incident Management System
TM21-Speed Harmonization
TM24-Tunnel Management
VS09-Reduced Speed Zone Warning / Lane Closure
VS12-Vulnerable Road User Safety
VS13-Intersection Safety Warning and Collision Avoidance

Associated Goals

Improve the efficiency of the surface transportation system
Improve the resiliency and reliability of the surface transportation system

Planning Factors

G. Promote efficient system management and operation;
I. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation;

Source

Planning for Operations Desk Reference



 
Since the mapping between objectives and service packages is not always straight-forward and often situation-dependent, these mappings should only be used as a starting point. Users should do their own analysis to identify the best service packages for their region.