Performance Measure

Hours of delay associated with incidents.

Associated Objectives

Reduce delay associated with incidents on arterials by X percent by year Y.
Reduce delay associated with incidents on the freeway system by X percent by year Y.

Service Packages that Support the Performance Measure

VS05-Curve Speed Warning
ST02-Eco-Traffic Signal Timing
CVO06-Freight Signal Priority
TM04-Connected Vehicle Traffic Signal System
VS12-Vulnerable Road User Safety
VS08-Queue Warning
VS13-Intersection Safety Warning and Collision Avoidance
VS10-Restricted Lane Warnings
VS09-Reduced Speed Zone Warning / Lane Closure
TM21-Speed Harmonization
ST03-Eco-Traffic Metering
TI07-In-Vehicle Signage
TM03-Traffic Signal Control
TM05-Traffic Metering
TM06-Traffic Information Dissemination
TM08-Traffic Incident Management System
TM20-Variable Speed Limits
TM22-Dynamic Lane Management and Shoulder Use
MC06-Work Zone Management
TI01-Broadcast Traveler Information
PS08-Roadway Service Patrols
TM24-Tunnel Management

Associated Goals

Improve the efficiency of the surface transportation system
Improve the resiliency and reliability of the surface transportation system

Planning Factors

G. Promote efficient system management and operation;
I. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation;

Source

Planning for Operations Desk Reference